Material Fatigue
Predict how repeated loading changes failure risk.
Rafi ChenPrototype constraint lead
Design goals, tradeoffs, materials, testing, and iteration.
Age band13-16
DomainEngineering
DeliveryLocal-first
ReviewTeacher required
Control kitload, material, shape
Choose a grid cell, then save a repair or draft packet.
